Back to Our Products

EV Feeder Capacity Screener

Distribution Impact Analysis Tool

27%

Canada's EV fleet grew 27% in 2025

39%

London's new EV registrations rose 39% in one quarter

Source: Statistics Canada, "A pan-Canadian electric feel" (September 2026). Fleet growth calculated from registered zero-emission vehicles, 2024 to 2025; London figure is new registrations, Q1 to Q2 2026.

Your Feeder

Four numbers are all you need. Everything else has sensible defaults under More Scenario Settings.

The feeder or transformer rating. Your planning team will have it.

Last year's peak demand on this feeder, before new EVs.

Residential customers served by this feeder.

"What happens to my feeder when 20% of homes have EVs?"

Enter the level you want to check, e.g. 20%.

Already have EVs on this feeder? Enter today's share under More Scenario Settings → Adoption Timeline → Current EV share. It sets when you reach this level and the year you run out of capacity.

More Scenario Settings Charging details, adoption timeline, managed charging and advanced assumptions. Defaults are already applied. ▾
Charging Details Home charger size and commercial fast chargers ▾

Assumes a 35% feeder EV coincidence, meaning 35% of EV chargers on the feeder are expected to be drawing power at the same time during the evening peak.

Models 150kW DCFC units with a 50% diversity factor, meaning about that share of fast chargers are expected to be in use at the same time.

Adoption Timeline Drives the year of first overload ▾

How many homes on this feeder have an EV today. Sets when you reach the EV share you're testing and the year you run out of capacity.

Reference: zero-emission vehicles were 3.5% of Canada's 25.3 million registered light-duty vehicles in 2025, up from 2.8% in 2024 (Statistics Canada). Ontario trails the national average, so 5% of homes is a reasonable starting point; use your own data if you have it.

Compounding yearly growth, capped at 100% of homes.

Reference: Canada's registered zero-emission vehicle fleet grew by about 27% in 2025 (+189,803 vehicles) and 44% in 2024 (+212,473), calculated from Statistics Canada figures. Growth slowed in 2025 after federal incentives were paused, so 25% is a reasonable default.

Non-EV growth such as new connections and heat pumps.

Managed Charging Shift residential charging off-peak ▾

Via time-of-use rates or managed charging programs. 0% = uncontrolled.

Advanced Assumptions Feeder coincidence, power factor and planning limit ▾
  • Feeder EV coincidence: the share of home EV chargers on the whole feeder drawing power at the same moment during the evening peak. Studies of large EV populations (hundreds of EVs) typically find 25–35%; the default of 35% is the conservative end of that range. It applies to the feeder results only; the local transformer check has its own coincidence in the Beyond the feeder section.
  • Planning limit: many utilities plan feeders to a loading target below 100% of thermal rating (for example 75–80%) to keep reserve for contingencies.
  • Existing load at EV peak: how much of your peak load is still there in the evening, when EVs charge. If your feeder peaks at 7,500 kW on a summer afternoon but carries about 6,750 kW in the evening, enter 90%. Not sure? Leave it at 100% (worst case).
  • L3 diversity: how many commercial Level 3 DC fast chargers are in use at the same time. For example, at 50%, if you enter 6 L3 chargers under Charging Details, the tool expects 3 to be in use, adding 3 × 150 kW = 450 kW.

Your Results

Feeder

The whole feeder at peak, using the conservative default feeder EV coincidence (35%). Settings: More Scenario Settings → Advanced Assumptions.

Peak load with EVs

0 kW

Spare capacity

0 kW

Runs out of capacity

–

Based on current EV share and growth (More Scenario Settings)

What if more homes get EVs?

Homes with EVs Peak with EVs Spare / over Transformers at risk Status

Status at each EV share today. The verdict above also considers the year the feeder runs out of capacity.

Beyond the feeder

Your local transformers and secondary lines may already be overloaded

Many secondary conductors and service drops were sized decades ago, before homes added EV chargers, hot tubs, saunas and heat pumps. Today those loads can push older secondaries past their rating, and some are overheating and melting in service. A single Level 2 EV charger draws 7–11 kW on its own.

  • EV chargers
  • Hot tubs
  • Saunas
  • Heat pumps

Local transformers (separate check)

Local transformers at risk

–

Service Transformer Settings Homes per transformer, size, peak per home and coincidence ▾

Homes served by a typical pole-top or pad-mount unit.

Common pole-top sizes: 25, 37.5, 50, 75, 100 kVA.

Peak per home is the diversified evening demand of a home without an EV. The 5 kW default is conservative; Ontario planning guidance often uses 2.5–4.5 kW.

The share of EVs on one transformer (typically 4–8) charging at the same moment. Small groups have little diversity, so planners use 70–80%. Set 100% for a stress test, for example when assessing ageing transformers for replacement. This is separate from the feeder EV coincidence.

How GenCore helps

Identify

A power system study measures today's real load on your secondaries and finds the sections that are overloaded.

Plan

A prioritized plan ranks which sections to address first, so budgets go where the risk is highest.

Manage & replace

We engineer the upgrades, from conductor and transformer sizing to replacement designs, and help manage load in the meantime.

Talk to us about your secondary lines
Methodology & Assumptions

This is a thermal screening tool. It uses simple diversity factors rather than a load-flow model, so results are fast and transparent. Every assumption below can be adjusted under Advanced Assumptions.

  • Feeder limit (kW): Feeder capacity (kVA) × Power factor × Planning limit %. This is the total load the feeder can carry.
  • Today's load at EV peak: Highest load today × Existing load at EV peak % (default 100%, set under Advanced Assumptions).
  • Room for new load: Feeder limit − Today's load at EV peak.
  • Home EV charging: Homes on this feeder × EV share to test × Charger size (kW) × Feeder EV coincidence × (1 − Managed charging %).
  • Fast chargers (DCFC): L3 charger count × 150 kW × L3 diversity.
  • Spare / over capacity: Feeder limit − (Today's load + Home EV charging + Fast chargers).
  • Room for more EVs: (Feeder limit − Today's load − Fast chargers) ÷ (Charger size × Feeder EV coincidence × (1 − Managed charging %)) gives the total EVs the feeder can take; the EVs already in your scenario are subtracted.
  • Runs out of capacity: EV share grows from the current EV share at the annual growth rate (compounding, capped at 100%), today's load grows at the base load growth rate, and fast chargers are held constant. The first year the projected evening peak exceeds the feeder limit is reported, up to 25 years out.
  • Two separate checks: the feeder results test the whole feeder, where hundreds of EVs spread out in time, so a low feeder EV coincidence applies. The local transformer check tests one typical transformer, where a handful of EVs spread out far less, so a higher transformer EV coincidence applies. The two are calculated independently and never added together.
  • Local transformers at risk: each transformer serves a fixed number of homes, and each home has an EV with probability equal to the EV share to test (binomial distribution). Small groups of chargers have little diversity, so a separate Transformer EV coincidence applies (default 80%; 100% for a stress test). A transformer is counted at risk when Homes per transformer × Peak per home + EVs × Charger size × Transformer EV coincidence × (1 − Managed charging %) exceeds its kVA rating × Power factor.
Sources

EV adoption and growth

Charging power and coincidence

Ontario regulation and planning

Engineering standards (checks beyond this screen)

  • CSA CAN3-C235, Preferred Voltage Levels: service voltage limits, which a full study checks.
  • IEEE Standard 519: harmonic and power quality requirements relevant to DC fast chargers.
What this screen doesn't capture
  • Which specific assets fail first: the tool estimates how many transformers are at risk, not which ones or where on the feeder.
  • Voltage drop at the ends of long feeders and secondaries, which often limits EV hosting before thermal ratings do.
  • Phase imbalance from single-phase Level 2 chargers clustering on one phase.
  • Hourly and seasonal load shapes: a single peak can't show how long overloads last or how much transformer life they consume.
  • Rebound peaks when managed charging programs start many chargers at the same off-peak time.
  • The 11 pm off-peak timer peak: with Ontario's Ultra-Low Overnight rate, many chargers start on timers at 11 pm, which can create a second, sharp peak that this evening-peak screen does not check.
  • Protection and short-circuit impacts of new DCFC sites and feeder reconfiguration.
  • Least-cost mitigation: comparing reconductoring, new feeders, load transfers, storage and managed charging.

Talk to an engineer

Power System Studies by GenCore

GenCore Utilities helps utilities plan for EV growth with detailed power system studies, including load flow, short circuit studies, protection & coordination, and Arc Flash studies modelled on your actual network.

  • Load flow
  • Short circuit
  • Protection & coordination
  • Arc flash

Questions about your results? Send us a note. Your screening results are included automatically.

Prefer email? Contact info@gencoreutilities.com. See how we handle your information in our .

Disclaimer: This tool provides a preliminary thermal capacity estimation based on simplified load diversity assumptions. It does not account for localized voltage drop, phase imbalance, or secondary transformer constraints beyond the simplified screen above. GenCore Utilities Ltd. assumes no responsibility for capital planning decisions made solely on these preliminary results. A full power system study, including but not limited to Load Flow, Short Circuit, and Protection and Coordination, is required for accurate grid planning.